• Meridians for ScotRail

    From Scott@newsgroups@gefion.myzen.co.uk to uk.railway on Wed Nov 25 09:48:39 2026
    From Newsgroup: uk.railway

    On 19 March 2026, ScotRail announced it will lease twenty-two Class
    222 units to replace the current HST fleet and will undergo an £80m
    overhaul and refurbishment programme, with the first train to enter
    service in late 2027 (Wikipedia).

    I understand the Meridian receives mixed reviews. Would anyone care to
    comment on the merits and demerits of this particular train? Is £80m
    excessive for overhaul refurbishment work. Is this likely to include a
    ScotRail vanity element? It is IMO unfortunate this train does not
    have bimode capability.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 12:04:57 2026
    From Newsgroup: uk.railway

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an
    HST), but pretty much all trains are like that now.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Scott@newsgroups@gefion.myzen.co.uk to uk.railway on Wed Nov 25 12:54:56 2026
    From Newsgroup: uk.railway

    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed >during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an >HST), but pretty much all trains are like that now.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 13:18:10 2026
    From Newsgroup: uk.railway

    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed >>during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an >>HST), but pretty much all trains are like that now.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily be >removed to improve mobile reception?

    It's something more embedded than just a coating, I think.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Rolf Mantel@news@hartig-mantel.de to uk.railway on Wed Nov 25 14:33:19 2026
    From Newsgroup: uk.railway

    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating in appropriate
    patterns dependent on the necessary frequency ranges, this can be
    applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zugwagen-werden-nachgelasert-9348337.html>

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Wed Nov 25 13:40:27 2026
    From Newsgroup: uk.railway

    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to
    comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed
    during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an
    HST), but pretty much all trains are like that now.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?


    It’s a thin metallic film, used to reduce solar radiation penetration. Most newer trains have it, but there’s now a later version with microscopic
    pores that allows phone and GPS signals to penetrate. I find that even
    with the older versions, phone signals worked, but GPS struggled.

    The 222s were due to be replaced by the 810s a couple of years ago, but the delivery delays and sub-standard quality of the new trains have meant that
    the tired 222s have had to struggle on, with just the minimum maintenance.
    They used to be very reliable, but not any more.

    They’re due a full refurbishment, probably at Litchurch Lane, similar to
    that being done on the whole Voyager fleet. Hopefully, that will include
    some much-needed mechanical fettling, as well as a respray and new carpets
    and upholstery.

    The Alstom announcement says:

    As part of the wider refurbishment programme, Alstom will deliver an
    extensive interior and exterior refresh, including new seating, tables, carpets, LED lighting and upgraded driver cabs, as well as toilet refurbishments and reconfiguration work to improve luggage, bicycle and accessibility provision. This refurbishment contract is with Beacon and is worth around £80 million.

    The programme also includes extensive onboard systems upgrades (including intelligent stop/start), with new passenger information systems and saloon media screens, hearing aid announcement systems, automatic passenger
    counting, CCTV, WiFi connectivity and enhanced cybersecurity measures. Defibrillators will be fitted to every train as part of the safety upgrade package.

    Nomad Digital – a wholly-owned subsidiary of Alstom – will deliver new WiFi connectivity to ScotRail, leveraging on satellite Low Earth Orbit
    technology. This means bringing more connectivity to passengers travelling between Glasgow, Edinburgh, Aberdeen and Inverness.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 13:52:22 2026
    From Newsgroup: uk.railway

    In message <fzBNS.88$Ke_3.41@fx10.ams1>, at 13:40:27 on Wed, 25 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>> comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed >>> during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an
    HST), but pretty much all trains are like that now.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    used to reduce solar radiation penetration. Most
    newer trains have it, but there’s now a later version with microscopic >pores that allows phone and GPS signals to penetrate. I find that even
    with the older versions, phone signals worked,

    The coating didn't completely block the mobile phone reception, but
    reduced it considerably.

    but GPS struggled.

    With more modern phones, the GPS reception penetrates the roof. You will rarely get a good view of sufficient satellites out of a train window,
    even if not coated.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 13:47:25 2026
    From Newsgroup: uk.railway

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov
    2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56
    on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily
    be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From ColinR@rail@greystane.shetland.co.uk to uk.railway on Wed Nov 25 14:36:53 2026
    From Newsgroup: uk.railway

    On 25/11/2026 13:47, Roland Perry wrote:
    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov
    2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56
    on  Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at
    09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone
    care to
    comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-
    blocking
    window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

     I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily
    be  removed to improve mobile reception?

     It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of sticky- backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug
    wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    From start of this thread "and will undergo an £80m
    overhaul and refurbishment programme".

    Maybe some of that will be used to improve the mobile reception. either
    by the above process or alternative methods.
    --
    Colin

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Scott@newsgroups@gefion.myzen.co.uk to uk.railway on Wed Nov 25 14:51:01 2026
    From Newsgroup: uk.railway

    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov
    2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56
    on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily
    be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of >sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money? Given this is a leased asset, I
    assumed refurbishment would be the responsibilty of the leasing
    company, (Eversholt) albeit with the cost reflected in the lease
    payments?

    It's unfortuate they cannot refurbish in bimode operation.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 15:19:10 2026
    From Newsgroup: uk.railway

    In message <11e6rq6$3qorc$1@dont-email.me>, at 14:36:53 on Wed, 25 Nov
    2026, ColinR <rail@greystane.shetland.co.uk> remarked:
    in appropriate patterns dependent on the necessary frequency ranges, >>>this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>> wagen-werden-nachgelasert-9348337.html>
    Using what as money? Scotrail doesn't have any to spare.

    From start of this thread "and will undergo an £80m
    overhaul and refurbishment programme".

    Maybe some of that will be used to improve the mobile reception. either
    by the above process or alternative methods.

    It's *not* in the laundry list, posted earlier:

    "The Alstom announcement says:

    As part of the wider refurbishment programme, Alstom will
    deliver an extensive interior and exterior refresh, including
    new seating, tables, carpets, LED lighting and upgraded driver
    cabs, as well as toilet refurbishments and reconfiguration work
    to improve luggage, bicycle and accessibility provision. This
    refurbishment contract is with Beacon and isworth around £80
    million.

    The programme also includes extensive onboard systems upgrades
    (intelligent stop/start), with new passenger information systems
    and saloon media screens, hearing aid announcement systems,
    automatic passenger counting, CCTV, WiFi connectivity and
    enhanced cybersecurity measures.

    Defibrillators will be fitted to every train as part of the
    safety upgrade package.

    Nomad Digital – a wholly-owned subsidiary of Alstom – will
    deliver new WiFi connectivity to ScotRail, leveraging on
    satellite Low Earth Orbit technology. This means bringing more
    connectivity to passengers travelling between Glasgow,
    Edinburgh, Aberdeen and Inverness."
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 15:21:13 2026
    From Newsgroup: uk.railway

    In message <hvsdgldqkdli7ab01ritll4jplu42b76ci@4ax.com>, at 14:51:01 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov >>2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of >>sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money?

    It's not mentioned in the £80m laundry list, so presumably it would be
    an "extra" Scotrail paid for afterwards.

    Given this is a leased asset, I assumed refurbishment would be the >responsibilty of the leasing company, (Eversholt) albeit with the cost >reflected in the lease payments?

    It's unfortuate they cannot refurbish in bimode operation.

    What?!? Convert them to bi-mode. You've got to be joking.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Scott@newsgroups@gefion.myzen.co.uk to uk.railway on Wed Nov 25 15:38:59 2026
    From Newsgroup: uk.railway

    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <hvsdgldqkdli7ab01ritll4jplu42b76ci@4ax.com>, at 14:51:01 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov >>>2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>>on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk> >>>>>> wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>>>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>
    I understand the Meridian receives mixed reviews. Would anyone care to >>>>>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>>>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you >>>>>> mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>>be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found >>>>on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of >>>sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges, >>>>this can be applied retroactively to existing trainsets.
    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>>wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money?

    It's not mentioned in the £80m laundry list, so presumably it would be
    an "extra" Scotrail paid for afterwards.

    But would this 'extra' not be amortised over the lease, thus
    translating into higher lease payments as I suggested?

    Given this is a leased asset, I assumed refurbishment would be the >>responsibilty of the leasing company, (Eversholt) albeit with the cost >>reflected in the lease payments?

    It's unfortuate they cannot refurbish in bimode operation.

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Wed Nov 25 15:45:05 2026
    From Newsgroup: uk.railway

    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov
    2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56
    on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily
    be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>> wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money? Given this is a leased asset, I
    assumed refurbishment would be the responsibilty of the leasing
    company, (Eversholt) albeit with the cost reflected in the lease
    payments?

    It's unfortuate they cannot refurbish in bimode operation.

    The 222s were good trains when initially delivered. I liked them. The real issue is what will be found when they undergo their underbody
    refurbishment. How knackered are the engines and their associated
    equipment, and can that be fixed, both in technical terms and within the
    budget available. I never really found the engine noise to be particularly troubling.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Wed Nov 25 15:56:36 2026
    From Newsgroup: uk.railway

    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <hvsdgldqkdli7ab01ritll4jplu42b76ci@4ax.com>, at 14:51:01 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov >>>> 2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>>> on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk> >>>>>>> wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>>
    I understand the Meridian receives mixed reviews. Would anyone care to
    comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines. >>>>>>>
    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you >>>>>>> mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>>> be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found >>>>> on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges, >>>>> this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>>> wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money?

    It's not mentioned in the £80m laundry list, so presumably it would be
    an "extra" Scotrail paid for afterwards.

    But would this 'extra' not be amortised over the lease, thus
    translating into higher lease payments as I suggested?

    Yes, Beacon is paying for fitting it, but ScotRail will be responsible for paying the Starlink fees.



    Given this is a leased asset, I assumed refurbishment would be the
    responsibilty of the leasing company, (Eversholt) albeit with the cost
    reflected in the lease payments?

    It's unfortuate they cannot refurbish in bimode operation.

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.

    Has any high-speed DMU ever been converted to a bimode, anywhere in the
    world? It would involve removing the engine from one car, and fitting the
    pan and transformer instead, then fitting a high-voltage bus line and replacement high voltage electronics and wiring to all the cars. That would probably involve new roofs and a complete rewiring, so the cost would be enormous, and the work would take years. There would no doubt be lots of problems along the way, as in all such projects. And running costs would
    rise, as diesel is cheaper than UK electricity. Given the limited remaining life (10-20 years) of these units, it’s unlikely that Beacon would be
    willing to fund this disastrous investment.



    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From hounslow3@hounslow3@yahoo.co.uk to uk.railway on Wed Nov 25 16:11:40 2026
    From Newsgroup: uk.railway

    On 25/11/2026 15:56, Recliner wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <hvsdgldqkdli7ab01ritll4jplu42b76ci@4ax.com>, at 14:51:01 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov >>>>> 2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>>>> on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk> >>>>>>>> wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>>>
    I understand the Meridian receives mixed reviews. Would anyone care to
    comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines. >>>>>>>>
    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you >>>>>>>> mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>>>> be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found >>>>>> on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges, >>>>>> this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>>>> wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money?

    It's not mentioned in the £80m laundry list, so presumably it would be
    an "extra" Scotrail paid for afterwards.

    But would this 'extra' not be amortised over the lease, thus
    translating into higher lease payments as I suggested?

    Yes, Beacon is paying for fitting it, but ScotRail will be responsible for paying the Starlink fees.



    Given this is a leased asset, I assumed refurbishment would be the
    responsibilty of the leasing company, (Eversholt) albeit with the cost >>>> reflected in the lease payments?

    It's unfortuate they cannot refurbish in bimode operation.

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.

    Has any high-speed DMU ever been converted to a bimode, anywhere in the world? It would involve removing the engine from one car, and fitting the pan and transformer instead, then fitting a high-voltage bus line and replacement high voltage electronics and wiring to all the cars. That would probably involve new roofs and a complete rewiring, so the cost would be enormous, and the work would take years. There would no doubt be lots of problems along the way, as in all such projects. And running costs would rise, as diesel is cheaper than UK electricity. Given the limited remaining life (10-20 years) of these units, it’s unlikely that Beacon would be willing to fund this disastrous investment.



    I know that New Jersey Transit runs bi-mode, diesel-to-OHLE trains on
    its Raritan Valley Line, thus allowing a one-seat ride into New York
    Penn Station, rather than having to change at Newark Penn.

    Is that what you mean?

    The line is diesel, but once trains join the Northeast Corridor, they
    raise their pantographs

    Entrance into New York Penn Station via the North River Tunnels is
    strictly OHLE, and diesel is not permitted in there.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Theo@theom+news@chiark.greenend.org.uk to uk.railway on Wed Nov 25 16:49:42 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.

    Has any high-speed DMU ever been converted to a bimode, anywhere in the world? It would involve removing the engine from one car, and fitting the pan and transformer instead, then fitting a high-voltage bus line and replacement high voltage electronics and wiring to all the cars. That would probably involve new roofs and a complete rewiring, so the cost would be enormous, and the work would take years. There would no doubt be lots of problems along the way, as in all such projects. And running costs would rise, as diesel is cheaper than UK electricity. Given the limited remaining life (10-20 years) of these units, it’s unlikely that Beacon would be willing to fund this disastrous investment.

    It's not a silly question. There was a Bombardier proposal 15 years ago: construct an additional pantograph car to feed the traction motors - no need
    to remove any engines. It was too expensive to be worthwhile then and so
    it's going to be even less worthwhile now: https://www.railnews.co.uk/news/general/2011/12/23-evoyager-project-costs-still-seen.html

    (one reason the cost was high was that it was a small order of vehicles
    which hadn't been in production for some time, hence associated tooling
    costs, and retrofitting trains which weren't designed for it. It probably would have been cheaper were the Voyager production line still operating and provision included from the start)

    Theo
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Wed Nov 25 17:06:25 2026
    From Newsgroup: uk.railway

    hounslow3 <hounslow3@yahoo.co.uk> wrote:
    On 25/11/2026 15:56, Recliner wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <hvsdgldqkdli7ab01ritll4jplu42b76ci@4ax.com>, at 14:51:01 on >>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov >>>>>> 2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>>>>> on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk> >>>>>>>>> wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>>>>
    I understand the Meridian receives mixed reviews. Would anyone care to
    comment on the merits and demerits of this particular train? >>>>>>>
    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines. >>>>>>>>>
    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you >>>>>>>>> mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>>>>> be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found >>>>>>> on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges, >>>>>>> this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug
    wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money?

    It's not mentioned in the £80m laundry list, so presumably it would be >>>> an "extra" Scotrail paid for afterwards.

    But would this 'extra' not be amortised over the lease, thus
    translating into higher lease payments as I suggested?

    Yes, Beacon is paying for fitting it, but ScotRail will be responsible for >> paying the Starlink fees.



    Given this is a leased asset, I assumed refurbishment would be the
    responsibilty of the leasing company, (Eversholt) albeit with the cost >>>>> reflected in the lease payments?

    It's unfortuate they cannot refurbish in bimode operation.

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.

    Has any high-speed DMU ever been converted to a bimode, anywhere in the
    world? It would involve removing the engine from one car, and fitting the >> pan and transformer instead, then fitting a high-voltage bus line and
    replacement high voltage electronics and wiring to all the cars. That would >> probably involve new roofs and a complete rewiring, so the cost would be
    enormous, and the work would take years. There would no doubt be lots of
    problems along the way, as in all such projects. And running costs would
    rise, as diesel is cheaper than UK electricity. Given the limited remaining >> life (10-20 years) of these units, it’s unlikely that Beacon would be
    willing to fund this disastrous investment.



    I know that New Jersey Transit runs bi-mode, diesel-to-OHLE trains on
    its Raritan Valley Line, thus allowing a one-seat ride into New York
    Penn Station, rather than having to change at Newark Penn.

    Is that what you mean?

    There’s nothing new about bimodes (see the class 73, and equivalents elsewhere, such as the 1950s Swiss Tem I). But that wasn’t my question,
    which was whether any high-speed DMUs have been converted to bimodes.




    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Wed Nov 25 17:06:27 2026
    From Newsgroup: uk.railway

    Theo <theom+news@chiark.greenend.org.uk> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.

    Has any high-speed DMU ever been converted to a bimode, anywhere in the
    world? It would involve removing the engine from one car, and fitting the >> pan and transformer instead, then fitting a high-voltage bus line and
    replacement high voltage electronics and wiring to all the cars. That would >> probably involve new roofs and a complete rewiring, so the cost would be
    enormous, and the work would take years. There would no doubt be lots of
    problems along the way, as in all such projects. And running costs would
    rise, as diesel is cheaper than UK electricity. Given the limited remaining >> life (10-20 years) of these units, it’s unlikely that Beacon would be
    willing to fund this disastrous investment.

    It's not a silly question. There was a Bombardier proposal 15 years ago: construct an additional pantograph car to feed the traction motors - no need to remove any engines.

    My assumption was that one of the existing carriages would have its engine, generator and fuel tank removed, and pan+transformer added, precisely
    because of the costs associated with adding an extra pantograph trailer.


    It was too expensive to be worthwhile then and so
    it's going to be even less worthwhile now: https://www.railnews.co.uk/news/general/2011/12/23-evoyager-project-costs-still-seen.html

    Which is exactly why I ignored that option.


    (one reason the cost was high was that it was a small order of vehicles
    which hadn't been in production for some time, hence associated tooling costs, and retrofitting trains which weren't designed for it. It probably would have been cheaper were the Voyager production line still operating and provision included from the start)

    There would also have to be a 25kV bus line along the train roof, with all
    the motors capable of being driven from either the local diesel engine or
    the power bus. So, completely new high-power electronics and wiring. That
    would probably require new roofs in all the carriages.

    Effectively, it would be a complete rebuild of the trains, making them more expensive than a brand-new train. And then they’d cost more to run on electricity, and be slower on diesel power than now. And that’s if they worked at all.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Wed Nov 25 20:14:37 2026
    From Newsgroup: uk.railway

    In message <UyDNS.31$QXZ3.13@fx17.ams1>, at 15:56:36 on Wed, 25 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:
    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges, >>>>>> this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>>>> wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money?

    It's not mentioned in the £80m laundry list, so presumably it would be
    an "extra" Scotrail paid for afterwards.

    But would this 'extra' not be amortised over the lease, thus
    translating into higher lease payments as I suggested?

    Yes, Beacon is paying for fitting it, but ScotRail will be responsible for >paying the Starlink fees.

    Starlink is providing the on-board wifi connectivity, which is
    completely and utterly nothing at all to do with fixing the
    windows so people can use their phones.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Bevan Price@bevanprice666@gmail.com to uk.railway on Thu Nov 26 14:05:44 2026
    From Newsgroup: uk.railway

    On 25/11/2026 13:40, Recliner wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>> comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed >>> during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an
    HST), but pretty much all trains are like that now.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?


    It’s a thin metallic film, used to reduce solar radiation penetration. Most newer trains have it, but there’s now a later version with microscopic pores that allows phone and GPS signals to penetrate. I find that even
    with the older versions, phone signals worked, but GPS struggled.

    The 222s were due to be replaced by the 810s a couple of years ago, but the delivery delays and sub-standard quality of the new trains have meant that the tired 222s have had to struggle on, with just the minimum maintenance. They used to be very reliable, but not any more.

    They’re due a full refurbishment, probably at Litchurch Lane, similar to that being done on the whole Voyager fleet. Hopefully, that will include
    some much-needed mechanical fettling, as well as a respray and new carpets and upholstery.

    The Alstom announcement says:

    As part of the wider refurbishment programme, Alstom will deliver an extensive interior and exterior refresh, including new seating, tables, carpets, LED lighting and upgraded driver cabs, as well as toilet refurbishments and reconfiguration work to improve luggage, bicycle and accessibility provision. This refurbishment contract is with Beacon and is worth around £80 million.

    The programme also includes extensive onboard systems upgrades (including intelligent stop/start), with new passenger information systems and saloon media screens, hearing aid announcement systems, automatic passenger counting, CCTV, WiFi connectivity and enhanced cybersecurity measures. Defibrillators will be fitted to every train as part of the safety upgrade package.

    Nomad Digital – a wholly-owned subsidiary of Alstom – will deliver new WiFi
    connectivity to ScotRail, leveraging on satellite Low Earth Orbit
    technology. This means bringing more connectivity to passengers travelling between Glasgow, Edinburgh, Aberdeen and Inverness.

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of 1st Class. Scotrail services should need less than that - maybe 1 or even
    1/2 coach of 1st Class as a maximum.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Thu Nov 26 15:31:07 2026
    From Newsgroup: uk.railway

    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Thu Nov 26 16:25:32 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to 5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used. But
    yes, 1st isn’t such a thing in Scotland. On the Edinburgh Glasgow service
    you can buy a supplement to upgrade, but most of the time the conductor doesn’t seem to bother.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Thu Nov 26 16:47:38 2026
    From Newsgroup: uk.railway

    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the
    half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used.

    Is that 2 in some units and 1.5 in others, or two in all but with half declassified in some?

    Lots of important detail missing in your response.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Thu Nov 26 17:02:34 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the
    half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used.

    Is that 2 in some units and 1.5 in others, or two in all but with half declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.
    In my experience most of the 222s have two complete coaches of 1st. At
    least one unit has 1 complete 1st coach and one that is half 1st and half
    2nd, by design. When that turns up the train manager sometimes apologises
    for the shortage of 1st.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Thu Nov 26 18:05:19 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov
    2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>> on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk> >>>>>> wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>>>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>
    I understand the Meridian receives mixed reviews. Would anyone care to >>>>>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>>>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you >>>>>> mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>> be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found >>>> on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>> wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money? Given this is a leased asset, I
    assumed refurbishment would be the responsibilty of the leasing
    company, (Eversholt) albeit with the cost reflected in the lease
    payments?

    It's unfortuate they cannot refurbish in bimode operation.

    The 222s were good trains when initially delivered. I liked them. The real issue is what will be found when they undergo their underbody
    refurbishment. How knackered are the engines and their associated
    equipment, and can that be fixed, both in technical terms and within the budget available. I never really found the engine noise to be particularly troubling.


    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide.
    Let’s hope ScotRail doesn’t make the same mistake!

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Arthur Figgis@afiggis@example.invalid to uk.railway on Thu Nov 26 18:17:24 2026
    From Newsgroup: uk.railway

    On 25/11/2026 15:56, Recliner wrote:

    Has any high-speed DMU ever been converted to a bimode, anywhere in the world?

    The small number of high(ish) speed DMUs is probably a limiting factor.
    --
    Arthur Figgis
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Thu Nov 26 18:30:48 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov >>>> 2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56 >>>>>> on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>> On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk> >>>>>>> wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on
    Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked: >>>>>>>>
    I understand the Meridian receives mixed reviews. Would anyone care to
    comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking
    window coatings, and of course sitting on top of noisy engines. >>>>>>>
    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you >>>>>>> mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>>> be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found >>>>> on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of
    sticky-backed plastic.

    in appropriate patterns dependent on the necessary frequency ranges, >>>>> this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>>>> wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.

    Would this be ScotRail's money? Given this is a leased asset, I
    assumed refurbishment would be the responsibilty of the leasing
    company, (Eversholt) albeit with the cost reflected in the lease
    payments?

    It's unfortuate they cannot refurbish in bimode operation.

    The 222s were good trains when initially delivered. I liked them. The real >> issue is what will be found when they undergo their underbody
    refurbishment. How knackered are the engines and their associated
    equipment, and can that be fixed, both in technical terms and within the
    budget available. I never really found the engine noise to be particularly >> troubling.


    As Lumo has found, EMR’s 222s are in worse shape than expected, and need more technical remedial work than it had contracted Alstom to provide. Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with
    one power car missing. Hopefully the 222 refurb will be more successful.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Robert@coppercapped@gmail.com to uk.railway on Thu Nov 26 20:59:20 2026
    From Newsgroup: uk.railway

    On 25 Nov 2026 at 17:06:27 GMT+0, "Recliner" <recliner.usenet@gmail.com>
    wrote:

    Theo <theom+news@chiark.greenend.org.uk> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 15:21:13 +0000, Roland Perry <roland@perry.uk>

    What?!? Convert them to bi-mode. You've got to be joking.

    This seems to be mainstream opinion.

    Has any high-speed DMU ever been converted to a bimode, anywhere in the
    world? It would involve removing the engine from one car, and fitting the >>> pan and transformer instead, then fitting a high-voltage bus line and
    replacement high voltage electronics and wiring to all the cars. That would >>> probably involve new roofs and a complete rewiring, so the cost would be >>> enormous, and the work would take years. There would no doubt be lots of >>> problems along the way, as in all such projects. And running costs would >>> rise, as diesel is cheaper than UK electricity. Given the limited remaining >>> life (10-20 years) of these units, it’s unlikely that Beacon would be
    willing to fund this disastrous investment.

    It's not a silly question. There was a Bombardier proposal 15 years ago:
    construct an additional pantograph car to feed the traction motors - no need >> to remove any engines.

    My assumption was that one of the existing carriages would have its engine, generator and fuel tank removed, and pan+transformer added, precisely
    because of the costs associated with adding an extra pantograph trailer.


    It was too expensive to be worthwhile then and so
    it's going to be even less worthwhile now:
    https://www.railnews.co.uk/news/general/2011/12/23-evoyager-project-costs-still-seen.html

    Which is exactly why I ignored that option.


    (one reason the cost was high was that it was a small order of vehicles
    which hadn't been in production for some time, hence associated tooling
    costs, and retrofitting trains which weren't designed for it. It probably >> would have been cheaper were the Voyager production line still operating and >> provision included from the start)

    There would also have to be a 25kV bus line along the train roof, with all the motors capable of being driven from either the local diesel engine or
    the power bus. So, completely new high-power electronics and wiring. That would probably require new roofs in all the carriages.

    Effectively, it would be a complete rebuild of the trains, making them more expensive than a brand-new train. And then they’d cost more to run on electricity, and be slower on diesel power than now. And that’s if they worked at all.

    This was Project Thor. I attended an IMechE meeting on the topic some fifteen or sixteen years ago when some Bombardier engineers explained the proposals. Two possibilities were studied, one to convert an existing coach to straight electric operation with a transformer and the other to build a new coach with the electric feed and drop it into an existing train so that a four coach unit became a five coach unit and a five coach unit became a six coach unit.

    The proposal fell down for three reasons, the first being the engineering difficulties, the second being the phasing of the rebuilds and the third being the time left to amortise the costs of the conversion.

    The engineering problems are significant. In this family of trains the coaches are self-sufficient each with its own diesel engine and electric drive. There is no traction power cross feed between coaches so to supply electricity to
    the traction motors on the other coaches a pretty massive insulated cable
    would have to be fitted into the already cramped underframe past all the
    diesel engines, fuel tanks, radiators, batteries and so on and so forth or along the roof dropping down through the passenger compartments to reach the power electronics under the floor. Neither choice was easy, simple or cheap. The train control firm- and software would need changing and testing.

    The scheduling was equally problematic. It was estimated that each conversion would take several months whereby the first two or three units would take considerably longer as the staff worked out the bugs in the process together with the ensuing testing. So to ensure that the rebuild programme was
    completed in, if I remember rightly, about three to three and a half years at least four units would have to be worked on simultaneously allowing time to strip the units down before the rework could start. This raised the question
    of what other units of similar performance were available to backfill for the units in the workshops. At the time there weren't any.

    The projected costs meant that the lease payments would have had to have been considerably increased as the time to recoup the expenditure was short. In addition the operating and maintenance expenses would also have increased due to the greater complexity and the performance under diesel power would not
    have been so good as now as the train mass would have increased by some 40 or 50 tonnes with the same installed diesel power.

    It is not surprising the whole idea was rejected than and it is still more bonkers now.
    --
    Robert
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Charles Ellson@charlesellson@btinternet.com to uk.railway on Fri Nov 27 02:25:55 2026
    From Newsgroup: uk.railway

    On Wed, 25 Nov 2026 13:47:25 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <11e6o30$3pbp8$1@dont-email.me>, at 14:33:19 on Wed, 25 Nov
    2026, Rolf Mantel <news@hartig-mantel.de> remarked:
    Am 25.11.2026 um 14:18 schrieb Roland Perry:
    In message <t7mdgltobvettj84q6ktp0m6mmfklb7jdu@4ax.com>, at 12:54:56
    on Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>>>> comment on the merits and demerits of this particular train?

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>>> window coatings, and of course sitting on top of noisy engines.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily
    be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of >sticky-backed plastic.

    The sticky-backed plastic is generally the anti-shrapnel material.
    With some glass you can see a golden sheen from the metallic coating
    which is possibly equally as liable to have been applied to reflect
    sun/heat.

    in appropriate patterns dependent on the necessary frequency ranges,
    this can be applied retroactively to existing trainsets.

    <https://www.heise.de/news/Besserer-Mobilfunkempfang-Fenster-in-3300-Zug >>wagen-werden-nachgelasert-9348337.html>

    Using what as money? Scotrail doesn't have any to spare.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Charles Ellson@charlesellson@btinternet.com to uk.railway on Fri Nov 27 02:41:06 2026
    From Newsgroup: uk.railway

    On Wed, 25 Nov 2026 13:52:22 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <fzBNS.88$Ke_3.41@fx10.ams1>, at 13:40:27 on Wed, 25 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:
    Scott <newsgroups@gefion.myzen.co.uk> wrote:
    On Wed, 25 Nov 2026 12:04:57 +0000, Roland Perry <roland@perry.uk>
    wrote:

    In message <jabdglp34jjitadroq3moqrnblk5lu581v@4ax.com>, at 09:48:39 on >>>> Wed, 25 Nov 2026, Scott <newsgroups@gefion.myzen.co.uk> remarked:

    I understand the Meridian receives mixed reviews. Would anyone care to >>>>> comment on the merits and demerits of this particular train?

    When introduced they had tiny overhead storage racks, but that was fixed >>>> during a mid-life refurb.

    Other issues are: Rattles from the interior walls/ceiling, GSM-blocking >>>> window coatings, and of course sitting on top of noisy engines.

    When introduced, the power doors felt bum-achingly slow (compared to an >>>> HST), but pretty much all trains are like that now.

    Thanks. Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a
    metal oxide layer created while the glass is still in a hot state - <https://www.pilkington.com/en/gbl/knowledge-hub-selection/architectural-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-coatings>

    used to reduce solar radiation penetration. Most
    newer trains have it, but there’s now a later version with microscopic >>pores that allows phone and GPS signals to penetrate. I find that even >>with the older versions, phone signals worked,

    The coating didn't completely block the mobile phone reception, but
    reduced it considerably.

    but GPS struggled.

    With more modern phones, the GPS reception penetrates the roof. You will >rarely get a good view of sufficient satellites out of a train window,
    even if not coated.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 04:45:10 2026
    From Newsgroup: uk.railway

    In message <98qhglpe6o6bnsdos4b2g814iqrvp61vqr@4ax.com>, at 02:25:55 on
    Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G?

    I've not tried it on 5G, but it blocked 3G and 4G.

    2G is probably unimportant to most users. Can this coating readily >>>>>be removed to improve mobile reception?

    It's something more embedded than just a coating, I think.

    Generally, it is heat reflective metal coating on windows, to be found
    on most trains of that age.

    State of the art 2020+ is to laser-remove this coating

    So it's true that it's not as simple as peeling off some kind of >>sticky-backed plastic.

    The sticky-backed plastic is generally the anti-shrapnel material.
    With some glass you can see a golden sheen from the metallic coating
    which is possibly

    Certainly, not possibly

    equally as liable to have been applied to reflect sun/heat.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 04:51:17 2026
    From Newsgroup: uk.railway

    In message <v1rhgld5khmfillkt9r0a53m023rm2fjbg@4ax.com>, at 02:41:06 on
    Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a
    metal oxide layer created while the glass is still in a hot state - ><https://www.pilkington.com/en/gbl/knowledge-hub-selection/architectural-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-
    coatings>

    There was a long debate here, or somewhere similar, a couple of years
    ago about the word "film". Remember that the popular expression "filming
    an event with a camera", originally involved chemicals and celluloid.

    In the context of train carriage windows, it's pretty obvious that the
    word "film" would imply something stuck on, a bit like branding vinyls
    stuck on a train, even though the popular press always calls it "paint".

    So one could peel off a film which had been applied to a window, but a coating, being akin to paint, isn't something you'd expect to peel off.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 08:21:12 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <v1rhgld5khmfillkt9r0a53m023rm2fjbg@4ax.com>, at 02:41:06 on
    Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a
    metal oxide layer created while the glass is still in a hot state -
    <https://www.pilkington.com/en/gbl/knowledge-hub-selection/architectural-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-
    coatings>

    There was a long debate here, or somewhere similar, a couple of years
    ago about the word "film". Remember that the popular expression "filming
    an event with a camera", originally involved chemicals and celluloid.

    In the context of train carriage windows, it's pretty obvious that the
    word "film" would imply something stuck on, a bit like branding vinyls
    stuck on a train, even though the popular press always calls it "paint".

    So one could peel off a film which had been applied to a window, but a coating, being akin to paint, isn't something you'd expect to peel off.

    Well the whole industry of thin film coatings is going to upset you…..


    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Graeme Wall@rail@greywall.demon.co.uk to uk.railway on Fri Nov 27 08:28:44 2026
    From Newsgroup: uk.railway

    On 27/11/2026 02:25, Charles Ellson wrote:
    The sticky-backed plastic is generally the anti-shrapnel material.
    With some glass you can see a golden sheen from the metallic coating
    which is possibly equally as liable to have been applied to reflect
    sun/heat.

    Wasn't that the original intention? the phone screening was purely an unexpected consequence.
    --
    Graeme Wall
    The older I get, the better I was.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 09:08:29 2026
    From Newsgroup: uk.railway

    Graeme Wall <rail@greywall.demon.co.uk> wrote:
    On 27/11/2026 02:25, Charles Ellson wrote:
    The sticky-backed plastic is generally the anti-shrapnel material.
    With some glass you can see a golden sheen from the metallic coating
    which is possibly equally as liable to have been applied to reflect
    sun/heat.

    Wasn't that the original intention? the phone screening was purely an unexpected consequence.


    Yes, it’s purely to reduce solar gain. And I don’t have a problem with phone reception in such carriages, just GPS.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 09:27:58 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Graeme Wall <rail@greywall.demon.co.uk> wrote:
    On 27/11/2026 02:25, Charles Ellson wrote:
    The sticky-backed plastic is generally the anti-shrapnel material.
    With some glass you can see a golden sheen from the metallic coating
    which is possibly equally as liable to have been applied to reflect
    sun/heat.

    Wasn't that the original intention? the phone screening was purely an
    unexpected consequence.


    Yes, it’s purely to reduce solar gain. And I don’t have a problem with phone reception in such carriages, just GPS.



    A cellular repeater

    https://mavenwireless.com/transportation-in-train-repeaters/

    would be a helpful addition, rather than messing with the windows. At least that way you get the antenna sited more optimally, and the repeater is providing the extra transmit power in weak signal areas, rather than your phone’s battery.

    Interestingly, to me at least, is that on train Vodafone reception along
    the ECML between Berwick and Edinburgh is now continuous, as is Edinburgh
    to Glasgow.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 11:05:41 2026
    From Newsgroup: uk.railway

    In message <hMbOS.56$mME3.41@fx09.ams1>, at 09:08:29 on Fri, 27 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:
    Graeme Wall <rail@greywall.demon.co.uk> wrote:
    On 27/11/2026 02:25, Charles Ellson wrote:
    The sticky-backed plastic is generally the anti-shrapnel material.
    With some glass you can see a golden sheen from the metallic coating
    which is possibly equally as liable to have been applied to reflect
    sun/heat.

    Wasn't that the original intention? the phone screening was purely an
    unexpected consequence.

    Yes, it’s purely to reduce solar gain.

    Agreed.

    And I don’t have a problem with phone reception in such carriages,
    just GPS.

    Whereas I have issues with mobile data, especially in areas the signal strength is inherently low, but not with GPS.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 11:07:24 2026
    From Newsgroup: uk.railway

    In message <11ebeho$1ee08$1@dont-email.me>, at 08:21:12 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <v1rhgld5khmfillkt9r0a53m023rm2fjbg@4ax.com>, at 02:41:06 on
    Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a
    metal oxide layer created while the glass is still in a hot state -

    <https://www.pilkington.com/en/gbl/knowledge-hub-selection/architectur >>>al-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-
    coatings>

    There was a long debate here, or somewhere similar, a couple of years
    ago about the word "film". Remember that the popular expression "filming
    an event with a camera", originally involved chemicals and celluloid.

    In the context of train carriage windows, it's pretty obvious that the
    word "film" would imply something stuck on, a bit like branding vinyls
    stuck on a train, even though the popular press always calls it "paint".

    So one could peel off a film which had been applied to a window, but a
    coating, being akin to paint, isn't something you'd expect to peel off.

    Well the whole industry of thin film coatings is going to upset you…..

    Can you peel them off, though?
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 11:09:59 2026
    From Newsgroup: uk.railway

    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of >>>>> 1st Class. Scotrail services should need less than that - maybe 1 or >>>>> even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the >>>> half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to >>>> 5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used.

    Is that 2 in some units and 1.5 in others, or two in all but with half
    declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.

    And then you thought better of it, having realised you'd missed out
    important details.

    In my experience most of the 222s have two complete coaches of 1st.

    Maybe now they do. I don't know, haven't had the need to use one for
    many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and
    half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From ColinR@rail@greystane.shetland.co.uk to uk.railway on Fri Nov 27 11:55:59 2026
    From Newsgroup: uk.railway

    On 27/11/2026 11:09, Roland Perry wrote:


    At least one unit has 1 complete 1st coach and one that is half 1st
    and half 2nd, by design.

    Just one unit in the entire fleet?

    "At least one" means that there is one and may be more than one,
    possibly millions if the context applies. Your comment implies that you
    expect the poster to know for certain if it was only one or one of a
    potential larger number.

    A daft comment from Roland.
    --
    Colin

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Robert@coppercapped@gmail.com to uk.railway on Fri Nov 27 11:59:30 2026
    From Newsgroup: uk.railway

    On 27 Nov 2026 at 11:07:24 GMT+0, "Roland Perry" <roland@perry.uk> wrote:

    In message <11ebeho$1ee08$1@dont-email.me>, at 08:21:12 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <v1rhgld5khmfillkt9r0a53m023rm2fjbg@4ax.com>, at 02:41:06 on
    Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is
    probably unimportant to most users. Can this coating readily be
    removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a
    metal oxide layer created while the glass is still in a hot state -

    <https://www.pilkington.com/en/gbl/knowledge-hub-selection/architectur>al-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-
    coatings>

    There was a long debate here, or somewhere similar, a couple of years
    ago about the word "film". Remember that the popular expression "filming >>> an event with a camera", originally involved chemicals and celluloid.

    In the context of train carriage windows, it's pretty obvious that the
    word "film" would imply something stuck on, a bit like branding vinyls
    stuck on a train, even though the popular press always calls it "paint". >>>
    So one could peel off a film which had been applied to a window, but a
    coating, being akin to paint, isn't something you'd expect to peel off.

    Well the whole industry of thin film coatings is going to upset you…..

    Can you peel them off, though?

    Hmm, back in the second half of the last century I worked for three companies involved in what we called 'thin film coatings' being materials applied to workpieces by vacuum evaporation, sputtering, electrophoresis and variants of these techniques. Anti-reflection and reflective coatings are applied to optical components, electrically conductive coatings to a range of materials for all sorts of uses. I presented a paper to an international thin films conference held in Venice in about 1971 or 72 concerning the radio frequency sputtering of phosphors onto borosilicate glass substrates.

    None of these thin film coatings could be peeled off - if they could be then Quality Control would want a word with you...
    --
    Robert
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 12:07:56 2026
    From Newsgroup: uk.railway

    In message <11ebr4g$1j65k$1@dont-email.me>, at 11:55:59 on Fri, 27 Nov
    2026, ColinR <rail@greystane.shetland.co.uk> remarked:
    On 27/11/2026 11:09, Roland Perry wrote:


    At least one unit has 1 complete 1st coach and one that is half 1st
    and half 2nd, by design.

    Just one unit in the entire fleet?

    "At least one" means that there is one and may be more than one,
    possibly millions if the context applies. Your comment implies that you >expect the poster to know for certain if it was only one or one of a >potential larger number.

    The details of the fleet are available online. I don't have a reason to
    do his research for him. If he can't be bothered to be more specific
    than "at least one".

    A daft comment from Roland.

    An ever dafter response from you.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 12:08:51 2026
    From Newsgroup: uk.railway

    In message <11ebrb2$1j8f0$1@dont-email.me>, at 11:59:30 on Fri, 27 Nov
    2026, Robert <coppercapped@gmail.com> remarked:
    On 27 Nov 2026 at 11:07:24 GMT+0, "Roland Perry" <roland@perry.uk> wrote:

    In message <11ebeho$1ee08$1@dont-email.me>, at 08:21:12 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <v1rhgld5khmfillkt9r0a53m023rm2fjbg@4ax.com>, at 02:41:06 on >>>> Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is >>>>>>>> probably unimportant to most users. Can this coating readily be >>>>>>>> removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a
    metal oxide layer created while the glass is still in a hot state -

    <https://www.pilkington.com/en/gbl/knowledge-hub-selection/architect >>>>>ur>al-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-
    coatings>

    There was a long debate here, or somewhere similar, a couple of years
    ago about the word "film". Remember that the popular expression "filming >>>> an event with a camera", originally involved chemicals and celluloid.

    In the context of train carriage windows, it's pretty obvious that the >>>> word "film" would imply something stuck on, a bit like branding vinyls >>>> stuck on a train, even though the popular press always calls it "paint". >>>>
    So one could peel off a film which had been applied to a window, but a >>>> coating, being akin to paint, isn't something you'd expect to peel off. >>>
    Well the whole industry of thin film coatings is going to upset you…..

    Can you peel them off, though?

    Hmm, back in the second half of the last century I worked for three companies >involved in what we called 'thin film coatings' being materials applied to >workpieces by vacuum evaporation, sputtering, electrophoresis and variants of >these techniques. Anti-reflection and reflective coatings are applied to >optical components, electrically conductive coatings to a range of materials >for all sorts of uses. I presented a paper to an international thin films >conference held in Venice in about 1971 or 72 concerning the radio frequency >sputtering of phosphors onto borosilicate glass substrates.

    None of these thin film coatings could be peeled off

    Thankyou, that was the answer I was expecting.

    - if they could be then
    Quality Control would want a word with you...
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 13:04:04 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov >>>>> 2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class >>>>>> seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of >>>>>> 1st Class. Scotrail services should need less than that - maybe 1 or >>>>>> even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the >>>>> half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to >>>>> 5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used.

    Is that 2 in some units and 1.5 in others, or two in all but with half
    declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.

    And then you thought better of it, having realised you'd missed out important details.

    In my experience most of the 222s have two complete coaches of 1st.

    Maybe now they do. I don't know, haven't had the need to use one for
    many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and
    half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the
    start of the 810 introduction.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 13:08:51 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <11ebrb2$1j8f0$1@dont-email.me>, at 11:59:30 on Fri, 27 Nov
    2026, Robert <coppercapped@gmail.com> remarked:
    On 27 Nov 2026 at 11:07:24 GMT+0, "Roland Perry" <roland@perry.uk> wrote:

    In message <11ebeho$1ee08$1@dont-email.me>, at 08:21:12 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <v1rhgld5khmfillkt9r0a53m023rm2fjbg@4ax.com>, at 02:41:06 on >>>>> Fri, 27 Nov 2026, Charles Ellson <charlesellson@btinternet.com>
    remarked:
    Could you clarify: when you refer to 'GSM-blocking', do you
    mean 2G signals only or does this also affect 4G and 5G? 2G is >>>>>>>>> probably unimportant to most users. Can this coating readily be >>>>>>>>> removed to improve mobile reception?

    It’s a thin metallic film,

    A flim, or a coating?

    The difference between those descriptions is possibly academic.
    Pilkington seems to use either vacuum deposition on made glass or a >>>>>> metal oxide layer created while the glass is still in a hot state - >>>>>>

    <https://www.pilkington.com/en/gbl/knowledge-hub-selection/architect >>>>>>> al-and-technical-glass-knowledge-hub/learn-about-glass-technology/glass-
    coatings>

    There was a long debate here, or somewhere similar, a couple of years >>>>> ago about the word "film". Remember that the popular expression "filming >>>>> an event with a camera", originally involved chemicals and celluloid. >>>>>
    In the context of train carriage windows, it's pretty obvious that the >>>>> word "film" would imply something stuck on, a bit like branding vinyls >>>>> stuck on a train, even though the popular press always calls it "paint". >>>>>
    So one could peel off a film which had been applied to a window, but a >>>>> coating, being akin to paint, isn't something you'd expect to peel off. >>>>
    Well the whole industry of thin film coatings is going to upset you….. >>>
    Can you peel them off, though?

    Hmm, back in the second half of the last century I worked for three companies
    involved in what we called 'thin film coatings' being materials applied to >> workpieces by vacuum evaporation, sputtering, electrophoresis and variants of
    these techniques. Anti-reflection and reflective coatings are applied to
    optical components, electrically conductive coatings to a range of materials >> for all sorts of uses. I presented a paper to an international thin films
    conference held in Venice in about 1971 or 72 concerning the radio frequency >> sputtering of phosphors onto borosilicate glass substrates.

    None of these thin film coatings could be peeled off

    Thankyou, that was the answer I was expecting.

    - if they could be then
    Quality Control would want a word with you...


    Glass treated for thermal radiative properties has a terrible effect on
    high frequency RF. Modern double glazing is required to be so treated,
    usually known as K glass. It completely stops my 5 GHz WiFi and severely attenuates the 2.4 GHz band. No film to peel off.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 13:13:17 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov >>>>>> 2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class >>>>>>> seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of >>>>>>> 1st Class. Scotrail services should need less than that - maybe 1 or >>>>>>> even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5 >>>>>> coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the >>>>>> half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to >>>>>> 5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used. >>>>
    Is that 2 in some units and 1.5 in others, or two in all but with half >>>> declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words. >>
    And then you thought better of it, having realised you'd missed out
    important details.

    In my experience most of the 222s have two complete coaches of 1st.

    Maybe now they do. I don't know, haven't had the need to use one for
    many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and >>> half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the start of the 810 introduction.


    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf

    Once you allow for the large non-seating areas in the end coach, the net
    first class seating area is slightly larger than one carriage.

    It seems that ScotRail will be changing the interior layout to have fewer seats:

    • Interior & Exterior: New external livery, full interior refresh, new seating and tables in standard and first class, new carpets, LED lighting, upgraded driver cabs, and renovated toilets.

    • Layout & Accessibility: Reconfigured seating for better window alignment, increased luggage storage, a family area with unfolded pushchair spaces,
    six cycle spaces, wheelchair spaces (two in standard class, one in first class), and hearing aid announcement systems.

    • Connectivity & Onboard Systems: At-seat power (three-pin sockets, USB-A, USB-C), Wi-Fi (including Low Earth Orbit/satellite broadband), electronic
    seat reservations, passenger information systems with multimedia displays, automatic passenger counting, CCTV, defibrillators, and enhanced
    cybersecurity.

    • Catering & Emissions: Catering facilities supporting trolley and at-seat service, plus intelligent stop-start engine technology to cut fuel use and emissions.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 13:32:36 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov >>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov >>>>>>> 2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class >>>>>>>> seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of >>>>>>>> 1st Class. Scotrail services should need less than that - maybe 1 or >>>>>>>> even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5 >>>>>>> coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of >>>>>>> Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the >>>>>>> half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to >>>>>>> 5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used. >>>>>
    Is that 2 in some units and 1.5 in others, or two in all but with half >>>>> declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words. >>>
    And then you thought better of it, having realised you'd missed out
    important details.

    In my experience most of the 222s have two complete coaches of 1st.

    Maybe now they do. I don't know, haven't had the need to use one for
    many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and >>>> half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the
    start of the 810 introduction.


    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf

    Once you allow for the large non-seating areas in the end coach, the net first class seating area is slightly larger than one carriage.

    It seems that ScotRail will be changing the interior layout to have fewer seats:

    • Interior & Exterior: New external livery, full interior refresh, new seating and tables in standard and first class, new carpets, LED lighting, upgraded driver cabs, and renovated toilets.

    • Layout & Accessibility: Reconfigured seating for better window alignment, increased luggage storage, a family area with unfolded pushchair spaces,
    six cycle spaces, wheelchair spaces (two in standard class, one in first class), and hearing aid announcement systems.

    • Connectivity & Onboard Systems: At-seat power (three-pin sockets, USB-A, USB-C), Wi-Fi (including Low Earth Orbit/satellite broadband), electronic seat reservations, passenger information systems with multimedia displays, automatic passenger counting, CCTV, defibrillators, and enhanced cybersecurity.

    • Catering & Emissions: Catering facilities supporting trolley and at-seat service, plus intelligent stop-start engine technology to cut fuel use and emissions.



    One thing I’ve just discovered, Nomad Digital, purveyors of on train WiFi systems to the 222 refurb are wholly owned by Alstom who are doing the 222 refurb.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Bevan Price@bevanprice666@gmail.com to uk.railway on Fri Nov 27 13:34:14 2026
    From Newsgroup: uk.railway

    On 26/11/2026 15:31, Roland Perry wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5
    coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of
    Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to 5-car?

    There are several variations of Class 222 formations. Most of the 5
    coach versions have 1.5 coaches of 1st Class; a few have 2 coaches of
    1st Class, and two of the ex-Hull 222s, increased from 4 to 5 coaches,
    have 2.5 1st Class coaches.

    3.5 standard class Meridian coaches contain fewer seats than 3 HST
    coaches, which I consider inadequate for many MML services - fortunately
    my only trips are very occasional and just at the Northern end of that
    line.

    MML originally 9 and 4 coach formations, but these were adjusted (in
    stages) to give 7 and 5 coach formations. (And 5 of the 7 coach sets
    have now been reduced to 6 coaches for the Lumo "Stirling" services.)
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 13:39:03 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov >>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov >>>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov >>>>>>>> 2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class >>>>>>>>> seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of >>>>>>>>> 1st Class. Scotrail services should need less than that - maybe 1 or >>>>>>>>> even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5 >>>>>>>> coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of >>>>>>>> Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the
    half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used. >>>>>>
    Is that 2 in some units and 1.5 in others, or two in all but with half >>>>>> declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.

    And then you thought better of it, having realised you'd missed out
    important details.

    In my experience most of the 222s have two complete coaches of 1st.

    Maybe now they do. I don't know, haven't had the need to use one for
    many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and >>>>> half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the >>> start of the 810 introduction.


    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf >>
    Once you allow for the large non-seating areas in the end coach, the net
    first class seating area is slightly larger than one carriage.

    It seems that ScotRail will be changing the interior layout to have fewer
    seats:

    • Interior & Exterior: New external livery, full interior refresh, new
    seating and tables in standard and first class, new carpets, LED lighting, >> upgraded driver cabs, and renovated toilets.

    • Layout & Accessibility: Reconfigured seating for better window alignment,
    increased luggage storage, a family area with unfolded pushchair spaces,
    six cycle spaces, wheelchair spaces (two in standard class, one in first
    class), and hearing aid announcement systems.

    • Connectivity & Onboard Systems: At-seat power (three-pin sockets, USB-A, >> USB-C), Wi-Fi (including Low Earth Orbit/satellite broadband), electronic
    seat reservations, passenger information systems with multimedia displays, >> automatic passenger counting, CCTV, defibrillators, and enhanced
    cybersecurity.

    • Catering & Emissions: Catering facilities supporting trolley and at-seat >> service, plus intelligent stop-start engine technology to cut fuel use and >> emissions.


    One thing I’ve just discovered, Nomad Digital, purveyors of on train WiFi systems to the 222 refurb are wholly owned by Alstom who are doing the 222 refurb.

    Yes, that’s why it got an explicit mention in the Alstom announcement.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 14:00:55 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov >>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov >>>>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov >>>>>>>>> 2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class >>>>>>>>>> seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of >>>>>>>>>> 1st Class. Scotrail services should need less than that - maybe 1 or >>>>>>>>>> even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5 >>>>>>>>> coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of >>>>>>>>> Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the
    half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used. >>>>>>>
    Is that 2 in some units and 1.5 in others, or two in all but with half >>>>>>> declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.

    And then you thought better of it, having realised you'd missed out >>>>> important details.

    In my experience most of the 222s have two complete coaches of 1st. >>>>>
    Maybe now they do. I don't know, haven't had the need to use one for >>>>> many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and >>>>>> half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the >>>>>> shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the >>>> start of the 810 introduction.


    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf >>>
    Once you allow for the large non-seating areas in the end coach, the net >>> first class seating area is slightly larger than one carriage.

    It seems that ScotRail will be changing the interior layout to have fewer >>> seats:

    • Interior & Exterior: New external livery, full interior refresh, new >>> seating and tables in standard and first class, new carpets, LED lighting, >>> upgraded driver cabs, and renovated toilets.

    • Layout & Accessibility: Reconfigured seating for better window alignment,
    increased luggage storage, a family area with unfolded pushchair spaces, >>> six cycle spaces, wheelchair spaces (two in standard class, one in first >>> class), and hearing aid announcement systems.

    • Connectivity & Onboard Systems: At-seat power (three-pin sockets, USB-A,
    USB-C), Wi-Fi (including Low Earth Orbit/satellite broadband), electronic >>> seat reservations, passenger information systems with multimedia displays, >>> automatic passenger counting, CCTV, defibrillators, and enhanced
    cybersecurity.

    • Catering & Emissions: Catering facilities supporting trolley and at-seat
    service, plus intelligent stop-start engine technology to cut fuel use and >>> emissions.


    One thing I’ve just discovered, Nomad Digital, purveyors of on train WiFi >> systems to the 222 refurb are wholly owned by Alstom who are doing the 222 >> refurb.

    Yes, that’s why it got an explicit mention in the Alstom announcement.



    I thought they were just bigging up some third party stuff they had
    purchased. There’s been some real world testing of Starlink on Italian high speed trains. Seems to work well.

    https://en.ilsole24ore.com/art/starlink-high-speed-test-300-internet-per-hour-on-italo-trains-AJPNDP8
    Paywall but can be circumvented.


    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 14:05:00 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov >>>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov >>>>>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class >>>>>>>>>>> seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5 >>>>>>>>>> coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of >>>>>>>>>> Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the
    half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used. >>>>>>>>
    Is that 2 in some units and 1.5 in others, or two in all but with half >>>>>>>> declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.

    And then you thought better of it, having realised you'd missed out >>>>>> important details.

    In my experience most of the 222s have two complete coaches of 1st. >>>>>>
    Maybe now they do. I don't know, haven't had the need to use one for >>>>>> many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and
    half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the >>>>>>> shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the >>>>> start of the 810 introduction.


    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf

    Once you allow for the large non-seating areas in the end coach, the net >>>> first class seating area is slightly larger than one carriage.

    It seems that ScotRail will be changing the interior layout to have fewer >>>> seats:

    • Interior & Exterior: New external livery, full interior refresh, new >>>> seating and tables in standard and first class, new carpets, LED lighting, >>>> upgraded driver cabs, and renovated toilets.

    • Layout & Accessibility: Reconfigured seating for better window alignment,
    increased luggage storage, a family area with unfolded pushchair spaces, >>>> six cycle spaces, wheelchair spaces (two in standard class, one in first >>>> class), and hearing aid announcement systems.

    • Connectivity & Onboard Systems: At-seat power (three-pin sockets, USB-A,
    USB-C), Wi-Fi (including Low Earth Orbit/satellite broadband), electronic >>>> seat reservations, passenger information systems with multimedia displays, >>>> automatic passenger counting, CCTV, defibrillators, and enhanced
    cybersecurity.

    • Catering & Emissions: Catering facilities supporting trolley and at-seat
    service, plus intelligent stop-start engine technology to cut fuel use and >>>> emissions.


    One thing I’ve just discovered, Nomad Digital, purveyors of on train WiFi >>> systems to the 222 refurb are wholly owned by Alstom who are doing the 222 >>> refurb.

    Yes, that’s why it got an explicit mention in the Alstom announcement.



    I thought they were just bigging up some third party stuff they had purchased. There’s been some real world testing of Starlink on Italian high speed trains. Seems to work well.

    Until Musk decides otherwise…


    https://en.ilsole24ore.com/art/starlink-high-speed-test-300-internet-per-hour-on-italo-trains-AJPNDP8
    Paywall but can be circumvented.


    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 14:13:10 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ona$sauv$1@dont-email.me>, at 17:02:34 on Thu, 26 Nov >>>>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9mhr$rd3u$1@dont-email.me>, at 16:25:32 on Thu, 26 Nov >>>>>>>>> 2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11e9ebp$o0u9$1@dont-email.me>, at 14:05:44 on Thu, 26 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    Another thing that needs doing is to reduce the amount of 1st Class
    seating. A 5 coach MMR 222 typically contains about 1 1/2 coaches of
    1st Class. Scotrail services should need less than that - maybe 1 or
    even 1/2 coach of 1st Class as a maximum.

    The original 4-car Meridians had 1.5 coaches of First Class and 2.5 >>>>>>>>>>> coaches of Standard.

    Compared to the Turbostars they replaced which was 2.5 coaches of >>>>>>>>>>> Standard and 0.5 of First.

    They changed their mind quite quickly, and permanently declassified the
    half-coach of First.

    Did they really reinstate it later, when they extended the Meridians to
    5-car?

    5 cars have between 2 and 1.5 coaches of 1st class. It’s well used.

    Is that 2 in some units and 1.5 in others, or two in all but with half
    declassified in some?

    Lots of important detail missing in your response.

    I got very close to responding to that last sentence with some rude words.

    And then you thought better of it, having realised you'd missed out >>>>>>> important details.

    In my experience most of the 222s have two complete coaches of 1st. >>>>>>>
    Maybe now they do. I don't know, haven't had the need to use one for >>>>>>> many years.

    At least one unit has 1 complete 1st coach and one that is half 1st and
    half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the >>>>>>>> shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the >>>>>> start of the 810 introduction.


    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf

    Once you allow for the large non-seating areas in the end coach, the net >>>>> first class seating area is slightly larger than one carriage.

    It seems that ScotRail will be changing the interior layout to have fewer >>>>> seats:

    • Interior & Exterior: New external livery, full interior refresh, new >>>>> seating and tables in standard and first class, new carpets, LED lighting,
    upgraded driver cabs, and renovated toilets.

    • Layout & Accessibility: Reconfigured seating for better window alignment,
    increased luggage storage, a family area with unfolded pushchair spaces, >>>>> six cycle spaces, wheelchair spaces (two in standard class, one in first >>>>> class), and hearing aid announcement systems.

    • Connectivity & Onboard Systems: At-seat power (three-pin sockets, USB-A,
    USB-C), Wi-Fi (including Low Earth Orbit/satellite broadband), electronic >>>>> seat reservations, passenger information systems with multimedia displays,
    automatic passenger counting, CCTV, defibrillators, and enhanced
    cybersecurity.

    • Catering & Emissions: Catering facilities supporting trolley and at-seat
    service, plus intelligent stop-start engine technology to cut fuel use and
    emissions.


    One thing I’ve just discovered, Nomad Digital, purveyors of on train WiFi
    systems to the 222 refurb are wholly owned by Alstom who are doing the 222 >>>> refurb.

    Yes, that’s why it got an explicit mention in the Alstom announcement. >>>


    I thought they were just bigging up some third party stuff they had
    purchased. There’s been some real world testing of Starlink on Italian high
    speed trains. Seems to work well.

    Until Musk decides otherwise…


    Well yes. At least Amazon are building a competing system, though a tad
    delayed at the moment. They will do well simply by not being associated
    with Musk.



    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 14:17:44 2026
    From Newsgroup: uk.railway

    In message <11ebv44$1kp9t$1@dont-email.me>, at 13:04:04 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the >start of the 810 introduction.

    OK, so when you said "the train manager sometimes apologises for the
    shortage of 1st" you forgot to mention that this was post the very
    recent 810 introduction, not the previous twenty years when Meridians
    were running on the line.

    That's so sloppy, you could almost be AI.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 14:21:45 2026
    From Newsgroup: uk.railway

    In message <NlfOS.54$pdz3.48@fx15.ams1>, at 13:13:17 on Fri, 27 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:
    At least one unit has 1 complete 1st coach and one that is half 1st and >>>> half 2nd, by design.

    Just one unit in the entire fleet?

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the
    start of the 810 introduction.

    FWIW, the man in seat 61 shows this seat map:

    https://www.seat61.com/reference/trainseatplans/5-car-emr-meridian-2012.pdf

    Once you allow for the large non-seating areas in the end coach, the net >first class seating area is slightly larger than one carriage.

    OK, so the "1 complete 1st coach" is actually the end-coach which isn't
    *full* of seating.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 14:23:46 2026
    From Newsgroup: uk.railway

    In message <g6gOS.31011$SS8f.1351@fx13.ams1>, at 14:05:00 on Fri, 27 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:

    I thought they were just bigging up some third party stuff they had
    purchased. There’s been some real world testing of Starlink on Italian high
    speed trains. Seems to work well.

    Until Musk decides otherwise

    Starlink works well, it's just some *users* of Starlink who Musk
    apparently decides to degrade the service of.

    Let's hope GBR don't offend him in some way.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 14:32:40 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <11ebv44$1kp9t$1@dont-email.me>, at 13:04:04 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the
    start of the 810 introduction.

    OK, so when you said "the train manager sometimes apologises for the
    shortage of 1st" you forgot to mention that this was post the very
    recent 810 introduction, not the previous twenty years when Meridians
    were running on the line.

    That's so sloppy, you could almost be AI.

    Lack of reservations doesn’t change the number of 1st class seats. And I’m just reporting my experience of using the service. I’m unable to give you chapter and verse of the last 20 years of operations, and nor did I claim
    it. You appear to be getting increasingly ill mannered.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Anna Noyd-Dryver@anna@noyd-dryver.com to uk.railway on Fri Nov 27 14:39:24 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need >> more technical remedial work than it had contracted Alstom to provide.
    Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with
    one power car missing. Hopefully the 222 refurb will be more successful.


    That just sounds like normal HST maintenance, possibly.



    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Fri Nov 27 14:49:39 2026
    From Newsgroup: uk.railway

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need >>> more technical remedial work than it had contracted Alstom to provide.
    Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with
    one power car missing. Hopefully the 222 refurb will be more successful.


    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things that really ought to go to the scrap yard. I wonder what the lifetime costs
    of re-jigging the 222s for Scotrail are vs procuring some new bi-modes?
    TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem ideal. They spend some time on Diesel owing to ECML power shortages.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Fri Nov 27 14:40:22 2026
    From Newsgroup: uk.railway

    In message <11ec0sn$1lh6c$1@dont-email.me>, at 13:34:14 on Fri, 27 Nov
    2026, Bevan Price <bevanprice666@gmail.com> remarked:

    3.5 standard class Meridian coaches contain fewer seats than 3 HST
    coaches, which I consider inadequate for many MML services -
    fortunately my only trips are very occasional and just at the Northern
    end of that line.

    MML originally 9 and 4 coach formations, but these were adjusted (in
    stages) to give 7 and 5 coach formations. (And 5 of the 7 coach sets
    have now been reduced to 6 coaches for the Lumo "Stirling" services.)

    The original Meridians were ordered to replace 2-car (later extended to
    3-car) Turbostars on stopping services between Derby/Nottingham and
    London. HSTs operated the fast services.

    It was clearly thought adequate to replace the 3-car Turbostars with
    4-car (1.5 + 3.5) Meridians, but due to the much-criticised success of privatisation, MML had heroically increased the ridership sufficiently
    that even the layout of the 4-car Meridians was insufficient, and the
    half-car of First was declassified.

    The 9-car Meridians were a completely different project, ordered to
    increase the London-Sheffield via Derby frequency to 2tph, and for
    some time the regulator obstinately refused to allow the trains to
    enter service.

    So they were cannibalised down to 7-car, with the spare cars being used
    to lengthen most (but not all) the 4-car stopping services to 5-car.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 15:27:42 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need >>>> more technical remedial work than it had contracted Alstom to provide. >>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with >>> one power car missing. Hopefully the 222 refurb will be more successful. >>>

    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things that really ought to go to the scrap yard. I wonder what the lifetime costs of re-jigging the 222s for Scotrail are vs procuring some new bi-modes? TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric
    railcar with wooden seats in daily public service (but shortly to be
    replaced), and even a 1950 electric railcar in daily public service (also
    due to go, but perhaps not for another five years). But it’s lost its
    wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Anna Noyd-Dryver@anna@noyd-dryver.com to uk.railway on Fri Nov 27 16:15:16 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide. >>>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with >>>> one power car missing. Hopefully the 222 refurb will be more successful. >>>>

    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things >> that really ought to go to the scrap yard. I wonder what the lifetime costs >> of re-jigging the 222s for Scotrail are vs procuring some new bi-modes?
    TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem
    ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric railcar with wooden seats in daily public service (but shortly to be replaced), and even a 1950 electric railcar in daily public service (also
    due to go, but perhaps not for another five years). But it’s lost its wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Fri Nov 27 16:26:57 2026
    From Newsgroup: uk.railway

    Anna Noyd-Dryver <anna@noyd-dryver.com> posted:

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide. >>>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with >>>> one power car missing. Hopefully the 222 refurb will be more successful.


    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things
    that really ought to go to the scrap yard. I wonder what the lifetime costs
    of re-jigging the 222s for Scotrail are vs procuring some new bi-modes?
    TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem >> ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric railcar with wooden seats in daily public service (but shortly to be replaced), and even a 1950 electric railcar in daily public service (also due to go, but perhaps not for another five years). But it’s lost its wooden seats, replaced with 1980s tram seats (but with new upholstery). These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    Not exactly mainline.
    For the first: https://de.wikipedia.org/wiki/Bergbahn_Rheineck%E2%80%93Walzenhausen#/media/Datei:090915_Rheineck_IMG_1342.JPG

    Regards, ULF
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 16:28:20 2026
    From Newsgroup: uk.railway

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide. >>>>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with >>>>> one power car missing. Hopefully the 222 refurb will be more successful. >>>>>

    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things >>> that really ought to go to the scrap yard. I wonder what the lifetime costs >>> of re-jigging the 222s for Scotrail are vs procuring some new bi-modes?
    TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem >>> ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric
    railcar with wooden seats in daily public service (but shortly to be
    replaced), and even a 1950 electric railcar in daily public service (also
    due to go, but perhaps not for another five years). But it’s lost its
    wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    Correct! I think few Brits would have known both of those. Have you ridden both?

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Fri Nov 27 16:34:53 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> posted:

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide. >>>>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with
    one power car missing. Hopefully the 222 refurb will be more successful.


    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things
    that really ought to go to the scrap yard. I wonder what the lifetime costs
    of re-jigging the 222s for Scotrail are vs procuring some new bi-modes? >>> TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem >>> ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric
    railcar with wooden seats in daily public service (but shortly to be
    replaced), and even a 1950 electric railcar in daily public service (also >> due to go, but perhaps not for another five years). But it’s lost its
    wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    Correct! I think few Brits would have known both of those.

    Ah. Remote branch lines.

    https://en.wikipedia.org/wiki/Rheineck%E2%80%93Walzenhausen_mountain_railway#Future

    The old railcar shall operate until March. https://appenzellerbahnen.ch/de/reiseinformationen/streckenunterbrueche-bauprojekte/rhw.html
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 16:37:17 2026
    From Newsgroup: uk.railway

    Ulf Kutzner <user2991@newsgrouper.org.invalid> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> posted:

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide. >>>>>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with >>>>>> one power car missing. Hopefully the 222 refurb will be more successful.


    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things
    that really ought to go to the scrap yard. I wonder what the lifetime costs
    of re-jigging the 222s for Scotrail are vs procuring some new bi-modes? >>>> TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem >>>> ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric
    railcar with wooden seats in daily public service (but shortly to be
    replaced), and even a 1950 electric railcar in daily public service (also >>> due to go, but perhaps not for another five years). But it’s lost its
    wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    Not exactly mainline.
    For the first: https://de.wikipedia.org/wiki/Bergbahn_Rheineck%E2%80%93Walzenhausen#/media/Datei:090915_Rheineck_IMG_1342.JPG


    I described it as a remote branch line, not a main line. But even on main
    lines you do see some relatively elderly stock.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Rolf Mantel@news@hartig-mantel.de to uk.railway on Fri Nov 27 18:28:05 2026
    From Newsgroup: uk.railway

    Am 27.11.2026 um 17:26 schrieb Ulf Kutzner:
    Anna Noyd-Dryver <anna@noyd-dryver.com> posted:

    Recliner <recliner.usenet@gmail.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Tweed <usenet.tweed@gmail.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    As Lumo has found, EMR’s 222s are in worse shape than expected, and need
    more technical remedial work than it had contracted Alstom to provide. >>>>>>> Let’s hope ScotRail doesn’t make the same mistake!


    Trundling past the Haymarket depot, there were a number of HST sets with >>>>>> one power car missing. Hopefully the 222 refurb will be more successful. >>>>>>

    That just sounds like normal HST maintenance, possibly.

    I’m afraid I’m not qualified to say. Maybe I’m wrong, but it seems to be a
    very British thing to make do and mend, trying to extend the life of things
    that really ought to go to the scrap yard. I wonder what the lifetime costs
    of re-jigging the 222s for Scotrail are vs procuring some new bi-modes? >>>> TPE’s Hitachi bimodes that trundle between Newcastle and Edinburgh seem >>>> ideal. They spend some time on Diesel owing to ECML power shortages.

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric
    railcar with wooden seats in daily public service (but shortly to be
    replaced), and even a 1950 electric railcar in daily public service (also >>> due to go, but perhaps not for another five years). But it’s lost its
    wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    Not exactly mainline.
    For the first: https://de.wikipedia.org/wiki/Bergbahn_Rheineck%E2%80%93Walzenhausen#/media/Datei:090915_Rheineck_IMG_1342.JPG

    Heidelberger Bergbahn upper section runs the original cars from 1905/07
    in daily public service, 'not exactly main line' either.

    <https://de.wikipedia.org/wiki/Heidelberger_Bergbahn#/media/Datei:Bergbahn-heidelberg.jpg>

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Anna Noyd-Dryver@anna@noyd-dryver.com to uk.railway on Fri Nov 27 20:50:59 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    You see quite a lot of older stock in Switzerland, even on main lines.

    I went exploring remote branch lines, and came across one 1958 electric
    railcar with wooden seats in daily public service (but shortly to be
    replaced), and even a 1950 electric railcar in daily public service (also >>> due to go, but perhaps not for another five years). But it’s lost its
    wooden seats, replaced with 1980s tram seats (but with new upholstery).
    These are on normal services, not preserved lines.



    Rheineck-Walzenhausen and Le Locle-Les Brenets?

    Correct! I think few Brits would have known both of those. Have you ridden both?


    Rheineck-Walzenhausen in 2018, Le Locle-Les Brenets in 2022.


    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Anna Noyd-Dryver@anna@noyd-dryver.com to uk.railway on Fri Nov 27 20:51:01 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Fri Nov 27 22:42:21 2026
    From Newsgroup: uk.railway

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main
    lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be
    brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if
    the normal train fails. We used to do that, too.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Sat Nov 28 07:45:48 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> posted:

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main >> lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if
    the normal train fails.

    Anything older than EW IV for SBB?
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Graeme Wall@rail@greywall.demon.co.uk to uk.railway on Sat Nov 28 08:23:26 2026
    From Newsgroup: uk.railway

    On 27/11/2026 22:42, Recliner wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main >>> lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if
    the normal train fails. We used to do that, too.


    Are you prepared to pay the increased fares or taxes (or both) to pay
    for it?
    --
    Graeme Wall
    The older I get, the better I was.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Sat Nov 28 08:46:10 2026
    From Newsgroup: uk.railway

    Graeme Wall <rail@greywall.demon.co.uk> posted:

    On 27/11/2026 22:42, Recliner wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main >>> lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be brought into service to extend some trains, add extra services if there have been a lot of group reservations or simply to form backup trains if the normal train fails. We used to do that, too.


    Are you prepared to pay the increased fares or taxes (or both) to pay
    for it?

    They do have backup trainsets, they still add extra elements
    and extra trains from time to time. Fewer extra trains, many
    lines do not have spare capacity because of engineering works.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Sat Nov 28 09:04:10 2026
    From Newsgroup: uk.railway

    Graeme Wall <rail@greywall.demon.co.uk> wrote:
    On 27/11/2026 22:42, Recliner wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main >>>> lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be
    brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if
    the normal train fails. We used to do that, too.


    Are you prepared to pay the increased fares or taxes (or both) to pay
    for it?

    I’d want to see an analysis of the extra costs first. Rather depends on how much it might raise fares vs the possible benefits.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Recliner@recliner.usenet@gmail.com to uk.railway on Sat Nov 28 09:26:26 2026
    From Newsgroup: uk.railway

    Tweed <usenet.tweed@gmail.com> wrote:
    Graeme Wall <rail@greywall.demon.co.uk> wrote:
    On 27/11/2026 22:42, Recliner wrote:
    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main >>>>> lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be
    brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if >>> the normal train fails. We used to do that, too.


    Are you prepared to pay the increased fares or taxes (or both) to pay
    for it?

    I’d want to see an analysis of the extra costs first. Rather depends on how much it might raise fares vs the possible benefits.

    Switzerland seems to have a deal with its citizens to provide an extremely reliable, punctual public transport service. You can confidently plan multi-segment, complex journeys involving multiple modes of transport with fairly tight connections, knowing that you’ll get there, probably on time. It’s amazing to Brits how cable cars, buses, trams, funiculars and even
    ships are routinely connect with trains. As a train or cable car approaches
    a rural station, you see the post buses pulling up outside, and they leave
    just after the train. When I first travelled on Swiss public transport, I marvelled at my luck when these connections happened, but then realised
    it’s all planned to work that way.

    Most citizens purchase monthly or annual rovers covering a region or the
    whole country, so most journeys are routinely by public transport, which is clean and fairly comfortable. It’s a country where such decisions are put
    to referendums, so it’s by public consent. Ticket checks are frequent on trains, and most locals have their tickets on their phones. There are
    ticket machines at stations, but they’re not heavily used.

    Stations are all open, so it’s not uncommon to be able to step off a train and board a waiting bus or tram alongside the platform. There are also tram-trains which stop in main station forecourts, but have their own
    stations away from town centres.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Sat Nov 28 09:40:51 2026
    From Newsgroup: uk.railway

    Recliner <recliner.usenet@gmail.com> posted:


    Stations are all open, so it’s not uncommon to be able to step off a train and board a waiting bus or tram alongside the platform. There are also tram-trains which stop in main station forecourts, but have their own stations away from town centres.

    First electrified standard gauge line in Switzerland: https://fr.wikipedia.org/wiki/Ligne_Orbe_%E2%80%93_Chavornay#Anciens_mat%C3%A9riels_roulants
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Sat Nov 28 10:26:40 2026
    From Newsgroup: uk.railway

    In message <67xOS.1249$dEnf.137@fx11.ams1>, at 09:26:26 on Sat, 28 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:

    Switzerland seems to have a deal with its citizens to provide an extremely >reliable, punctual public transport service. You can confidently plan >multi-segment, complex journeys involving multiple modes of transport with >fairly tight connections, knowing that you’ll get there, probably on time.

    There's two reasons for that, firstly they have to encourage modal
    shift, otherwise the road system would seize up. There's almost no
    on-street or off-street car parking in Geneva for example (apart from
    for mopeds).

    Secondly, they make trains run on time by having very conservative
    timetabling and dwell time at major stations. I used to regularly catch
    a train from central Geneva to the airport, and it sat at the station
    for about five minutes, then crawled the last few miles.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Sat Nov 28 10:29:20 2026
    From Newsgroup: uk.railway

    In message <11ec4a8$1muc0$1@dont-email.me>, at 14:32:40 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <11ebv44$1kp9t$1@dont-email.me>, at 13:04:04 on Fri, 27 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:

    When that turns up the train manager sometimes apologises for the
    shortage of 1st.

    To people who forgot to reverve a seat, I suppose.

    You can’t reserve seats on the MML. They suspended reservations at the >>> start of the 810 introduction.

    OK, so when you said "the train manager sometimes apologises for the
    shortage of 1st" you forgot to mention that this was post the very
    recent 810 introduction, not the previous twenty years when Meridians
    were running on the line.

    That's so sloppy, you could almost be AI.

    Lack of reservations doesn’t change the number of 1st class seats. And I’m >just reporting my experience of using the service. I’m unable to give you >chapter and verse of the last 20 years of operations, and nor did I claim
    it.

    There's so many non-sequiturs there, I give up.

    You appear to be getting increasingly ill mannered.

    I'm getting less tolerant of sloppy postings.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Anna Noyd-Dryver@anna@noyd-dryver.com to uk.railway on Sat Nov 28 10:36:44 2026
    From Newsgroup: uk.railway

    Ulf Kutzner <user2991@newsgrouper.org.invalid> wrote:
    Recliner <recliner.usenet@gmail.com> posted:

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main >>>> lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be
    brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if
    the normal train fails.

    Anything older than EW IV for SBB?


    This page

    <https://www.reisezuege.ch/reisezuege/index.php?action=9&tfah_id=363>

    suggests that there is a "Bpm" with opening windows still used, but only in
    the formation of the one daily return trip of the Panoramic Express service between Lugano and Arth-Goldau.

    Older coaches still exist with SBB Historic for their special services.

    <https://www.reisezuege.ch/reisezuege/index.php?action=9> lists all coach types; <https://www.reisezuege.ch/reisezuege/index.php?action=12> lists all formations used.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Sat Nov 28 10:50:21 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> posted:

    In message <67xOS.1249$dEnf.137@fx11.ams1>, at 09:26:26 on Sat, 28 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:

    Switzerland seems to have a deal with its citizens to provide an extremely >reliable, punctual public transport service. You can confidently plan >multi-segment, complex journeys involving multiple modes of transport with >fairly tight connections, knowing that you’ll get there, probably on time.

    There's two reasons for that, firstly they have to encourage modal
    shift, otherwise the road system would seize up. There's almost no
    on-street or off-street car parking in Geneva for example (apart from
    for mopeds).

    Secondly, they make trains run on time by having very conservative timetabling and dwell time at major stations. I used to regularly catch
    a train from central Geneva to the airport, and it sat at the station
    for about five minutes, then crawled the last few miles.

    Stops take (from what I found) between one and five minutes,
    the shortest stops are for new (new) local services. https://widgets.oev-info.ch/publikation/jahresfpl/150.pdf
    Less luggage, more door lanes per passenger.
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Sat Nov 28 10:51:10 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> posted:


    I'm getting less tolerant of sloppy postings.

    Just stop sending them!
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Ulf Kutzner@user2991@newsgrouper.org.invalid to uk.railway on Sat Nov 28 11:06:32 2026
    From Newsgroup: uk.railway

    Anna Noyd-Dryver <anna@noyd-dryver.com> posted:

    Ulf Kutzner <user2991@newsgrouper.org.invalid> wrote:
    Recliner <recliner.usenet@gmail.com> posted:

    Anna Noyd-Dryver <anna@noyd-dryver.com> wrote:
    Recliner <recliner.usenet@gmail.com> wrote:

    [Switzerland]


    I described it as a remote branch line, not a main line. But even on main
    lines you do see some relatively elderly stock.


    There has been much modernisation since my first visit in 2008.


    One thing the Swiss still do is to keep old carriages in reserve, to be
    brought into service to extend some trains, add extra services if there
    have been a lot of group reservations or simply to form backup trains if >> the normal train fails.

    Anything older than EW IV for SBB?


    This page

    <https://www.reisezuege.ch/reisezuege/index.php?action=9&tfah_id=363>

    suggests that there is a "Bpm" with opening windows

    Re-built about 40 years ago from compartment version.

    still used, but only in
    the formation of the one daily return trip of the Panoramic Express service between Lugano and Arth-Goldau.

    For photographs. It's 2nd class but only 1st class tickets
    are accepted for the whole of the train. Seasonal service. https://de.wikipedia.org/wiki/Gotthard_Panorama_Express#Angebot
    Seen here: https://upload.wikimedia.org/wikipedia/commons/e/e7/SBB_Re_420_200_%2851888124338%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original

    Regards, ULF
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Sat Nov 28 12:25:47 2026
    From Newsgroup: uk.railway

    In message <1795863070-2991@newsgrouper.org>, at 10:51:10 on Sat, 28 Nov
    2026, Ulf Kutzner <user2991@newsgrouper.org.invalid> remarked:

    I'm getting less tolerant of sloppy postings.

    Just stop sending them!

    I think I should stop reading them, especially yours.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Tweed@usenet.tweed@gmail.com to uk.railway on Sat Nov 28 13:20:20 2026
    From Newsgroup: uk.railway

    Roland Perry <roland@perry.uk> wrote:
    In message <67xOS.1249$dEnf.137@fx11.ams1>, at 09:26:26 on Sat, 28 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:

    Switzerland seems to have a deal with its citizens to provide an extremely >> reliable, punctual public transport service. You can confidently plan
    multi-segment, complex journeys involving multiple modes of transport with >> fairly tight connections, knowing that you’ll get there, probably on time.

    There's two reasons for that, firstly they have to encourage modal
    shift, otherwise the road system would seize up. There's almost no
    on-street or off-street car parking in Geneva for example (apart from
    for mopeds).

    Secondly, they make trains run on time by having very conservative timetabling and dwell time at major stations. I used to regularly catch
    a train from central Geneva to the airport, and it sat at the station
    for about five minutes, then crawled the last few miles.

    I’m happy to trade journey time for reliability, within reasonable limits.

    --- Synchronet 3.21e-Linux NewsLink 1.2
  • From Roland Perry@roland@perry.uk to uk.railway on Sat Nov 28 13:55:10 2026
    From Newsgroup: uk.railway

    In message <11eekek$2iofb$1@dont-email.me>, at 13:20:20 on Sat, 28 Nov
    2026, Tweed <usenet.tweed@gmail.com> remarked:
    Roland Perry <roland@perry.uk> wrote:
    In message <67xOS.1249$dEnf.137@fx11.ams1>, at 09:26:26 on Sat, 28 Nov
    2026, Recliner <recliner.usenet@gmail.com> remarked:

    Switzerland seems to have a deal with its citizens to provide an extremely >>> reliable, punctual public transport service. You can confidently plan
    multi-segment, complex journeys involving multiple modes of transport with >>> fairly tight connections, knowing that you’ll get there, probably on time.

    There's two reasons for that, firstly they have to encourage modal
    shift, otherwise the road system would seize up. There's almost no
    on-street or off-street car parking in Geneva for example (apart from
    for mopeds).

    Secondly, they make trains run on time by having very conservative
    timetabling and dwell time at major stations. I used to regularly catch
    a train from central Geneva to the airport, and it sat at the station
    for about five minutes, then crawled the last few miles.

    I’m happy to trade journey time for reliability, within reasonable limits.

    Quite a few people are, but UK TOCs seem more interested in boasting
    about short journey times.
    --
    Roland Perry
    --- Synchronet 3.21e-Linux NewsLink 1.2